Kaduna Urban Renewal Facts by the APC-led administration of Malam Nasir El Rufai



1. The first phase of Kaduna Urban Renewal Project is the construction of seven new roads, spanning 23.4km, within Kaduna metropolis.

2. All roads of the Urban Renewal Project were selected based on the Max Lock Masterplan for Kaduna city; 

3. Fourteen existing roads will also be dualized or upgraded; 

4. A new road will connect Kabala Costain to Aliyu Makama road in Barnawa; 

5. The FRCN road Malali, will link College road at Unguwan Dosa; 

6. A new 9.65km road will connect Rabah road to Nnamdi Azikiwe road (the Western By-pass), with a link to the Rigasa train station; 

7. Another 5.73km road will connect the Umaru Musa Yar’Adua road in Millennium City to the Eastern By-pass; 

8. The urban renewal project will include the dualization of Yakubu Gowon way and building an underpass at Leventis roundabout; 

9. Several other roads will be upgraded, including Tafawa Balewa way, Swimming Pool road, Poly Road to Dutsinman Road via Kasuwan Barci roundabout; 

10. Likewise, Kinshasha road, and Shehu Laminu up to Ramat roads in Unguwan Rimi will be upgraded; 

11. The 4km Nasarawa to Flour Mill road will also be completed. 

12. Already, Katuru road, Alkali road, Muhammadu Buhari way (old WAFF road), up to Essence Junction have been dualised and upgraded; 

13. Centenary Park has almost been completed. 

14. The world class Galaxy Mall along Waff road, which will house 48 line shops, three Anchor Tenants spaces for a grocery store chain, electronics store and a cinema is ongoing; 

15. Gamji Gate has been upgraded and the Splash Park has been open to residents. A games arcade, a zoological garden and a movie theatre will be part of

About Dunio Mabushi

0 comments:

Post a comment